The Challenge
Continuous water ingress was reported in an admin block lift shaft, with water observed entering through the brickwork. Further ingress and damage affected a nearby underground pedestrian tunnel, within a few metres of the shaft.
Surrounding rooms showed no visible damage, and exposed pipework showed no leakage. SOS investigated the building's services and the nearby external area to assess possible sources of the water.
Key Challenges
- Continuous ingress through lift shaft brickwork
- A nearby tunnel also affected by water
- No visible leaks on exposed services
- Multiple possible sources to investigate
- Establishing the next steps from the evidence
The Solution
SOS investigated the lift shaft, nearby tunnel and surrounding rooms, combining visual checks with thermal, moisture, acoustic, pressure and dye testing.
Meter and tank monitoring assessed the water services. Samples from both affected areas and a mains tap were collected for comparative analysis.
Inspecting the affected areas: Water entry was documented in the lift shaft and nearby tunnel. Exposed water services, including waste discharge pipework, showed no visible leakage.
Checking surrounding areas: Thermal and acoustic checks found no significant anomalies. Moisture testing recorded no elevated readings in the adjacent locker room, surrounding rooms or corridors.
Testing the water services: Water meters remained stationary and tanks showed no replenishment demand. Hot and cold supplies held 3.5 bar for 30 minutes with no pressure drop.
Dye testing and water sampling: Flow and dye tests produced no immediate entry into the affected area. A 48-hour dye watch was advised. Three water samples were collected for analysis.
The Results
The report concluded that water was penetrating the tunnel walls and entering the lift shaft. No leaks were identified on the building's services during the investigation. Nearby works to failed water supply pipework supported further enquiries into an external source. A water main leak remained a potential cause, with water-sample analysis still pending.
- Hot and cold supplies held 3.5 bar for 30 minutes
- Water meters remained stationary during monitoring
- No immediate water or dye entry during flow tests
- Three samples collected for comparative analysis
- Water supplier investigation of external areas advised
- Monitor after repairs, then dry once causes are resolved
Why SOS Leak Detection?
A broad investigation assessed the building's services alongside the visible ingress. The findings narrowed the enquiries towards a possible external source and set out the further investigation, monitoring and drying needed before the case could be resolved.
-
Complementary methods
Visual, thermal, moisture, acoustic, pressure and dye testing assessed different possible sources. -
Measured test conditions
Hot and cold supply pipework held 3.5 bar for 30 minutes without a pressure drop. -
Follow-up built in
The client was asked to report any dye appearing within 48 hours so SOS could return. -
Water samples collected
Samples from the lift shaft, tunnel and mains tap were collected, with analysis pending. -
Clear recovery sequence
Request a water supplier investigation, monitor the lift shaft after external repairs, then implement drying.